Pre-Installation Advice; Risk Assessment; Siting Considerations - Dimplex Ec-eau Installation And User Instructions Manual

Heat pump cylinders without buffer tanks ec-eau series
Table of Contents

Advertisement

4 Pre-Installation
Advice
Please
read
the
carefully
before
installation. If in any doubt, please
call
the
appropriate
Disregarding the instructions given in
this manual in its entirety and any
relevant regulations, standards and
codes
of
practice
guarantee of this product.
Handling – depending on the size of
the unit and access to its installation
location, consideration must be given
to the handling of the unit. Please
note that handling, installation and
use of this product is subject to the
Health and Safety at Work Act.
If
the
unit
is
immediately, it should remain in its
protective packaging with all pipe
protectors/end
caps
prevent
damage
inside the cylinder and the coils.
Pipe work – the pipe runs should be
executed as short as possible, unused
pipe work should be removed and all
remaining pipe work should be lagged
in
accordance
requirements to prevent heat loss and
the formation of condensation.
Taps and fittings – all taps and
fittings incorporated in the unvented
system should have a rated operating
pressure of 0.6 MPa (6 bar) or above.

4.1 Risk assessment

The compilation of a risk assessment
is
strongly
recommended
installing the product. The following
areas require particular consideration
in addition to the information required
by the Health and Safety at Work Act.
following
section
commencing
help
desk.
will
void
the
not
installed
applied
to
and
dirt
deposit
with
regulatory
before
Pre-Installation
- scalding:
where
required
by
law
mixing valve is to be fitted to the
hot water outlet of the cylinder (see
also water borne organisms).
- explosion: the unit is fully equipped
with all relevant safety equipment
to comply with current regulations.
The correct design and function has
been verified by independent third
party
testing.
application
thereof
responsibility
of
installer.
- water
borne
Legionella):
if
assessment should be carried out
following
the
outlined in the Approved Code of
Practice L8.
- the
user
preference
considered when commissioning the
system, in particular when adjusting
the
solar
and
temperature and timer settings.

4.2 Siting considerations

When choosing a suitable location for
the cylinder the following aspects
should be considered:
- structural integrity
- access for installation, operation,
maintenance and replacement
- routing of discharge pipe work
- access to water mains supply, hot
and cold water distribution pipe
work
- access to suitable electricity supply
appropriate
or
a
thermostatic
The
correct
is
the
the
competent
organisms
(i.e.
applicable
a
risk
recommendations
must
be
auxiliary
system

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec-eau 125Ec-eau 150Ec-eau 210Ec-eau 250Ec-eau 300

Table of Contents