Baxi Nuvola 3 Comfort Operating And Installation Instructions page 17

High performance gas-fired wall-mounted boiler
Table of Contents

Advertisement

16.1 HORIZONTAL FLUE INSTALLATION OPTIONS
L max = 4 m
L max = 5 m - 140 Fi
L max = 3 m - 320 Fi
L max = 8 m Ø 80/125 mm
L max = 3 m
L max = 4 m - 140 Fi
L max = 2 m - 320 Fi
L max = 7 m Ø 80/125 mm
16.2 LAS FLUE DUCT INSTALLATION OPTIONS
16.3 VERTICAL FLUE INSTALLATION OPTIONS
This type of installation can be carried out on either a flat or a pitched roof by fitting a flue terminal and a special weathering surround
with sleeve (both available on request.
L max = 4 m
INSTRUCTIONS FOR FITTERS
L max = 3 m
L max = 4 m - 140 Fi
L max = 2 m - 320 Fi
L max = 7 m Ø 80/125 mm
L max = 4 m
L max = 5 m - 140 Fi
L max = 3 m - 320 Fi
L max = 8 m Ø 80/125 mm
L max = 4 m
L max = 2 m
17
L max = 4 m
L max = 5 m - 140 Fi
L max = 3 m - 320 Fi
L max = 8 m Ø 80/125 mm
L max = 3 m
C607215 - GB

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents