Page GENERAL REMARKS ..................3 Designation ............................3 Guarantee ............................3 TECHNICAL CHARACTERISTICS ............... 4 Dimensions ............................4 Gas side resisitance and required draught ..................4 III. ASSEMBLING THE BOILER ................5 IV. INSTALLATION ....................7 Hydraulicdiagram ..........................7 Installation ............................7 Draughtregulator ..........................
GENERALREMARKS Guarantee: - Reinforced thermal insulation thickness 50 Heat generator for hot water central heating. The guarantee does not cover: - Pre-wired control panel May be used to supply water radiators or - scale formation or its consequences - Main switch convectors.
III- ASSEMBLINGTHE BOILER A. Placement of the cast iron block : A stand should be constructed in compliance with the regulations and taking into account the dimensions and the weight of the boiler. Position the cast iron block by taking into account the dimensions of the casing. B.
Page 6
F. Placing of side panels : Fix the support of the casing (1) with 2 nuts M12 DIN 934 (see detailE) Fix 1 protection of cable Ø 24 (see detail E) Fix the support of the casing (2) with 2 screws M8-12 (see detail C) Fix side panel (3-4) with each time 2 screws M8-12 (see detailsD) G.
IV-INSTALLATION HYDRAULICDIAGRAM Radiators Safety valve Isolation valve Boiler Expansion tank Differential pressure valve (*) Isolation valve Circulation pump heating circuit Filling valve * In the case where all the radiators of the installation are provided with thermostat valves, provide a differential pressure valve between the boiler outflow and return - Installation These boilers are designed to be installed in a boiler room or in a service annex.
V-ELECTRICALDIAGRAM Burner 230 V - 50 Hz °C Main switch Safety limit with manual reset Boiler SP-051 HE thermostat NT 174 HE/2 VI-PUTTINGINTOSERVICE COLDFILLINGPRESSUREOFTHEINSTALLATION The pressure with which the water of the Filling the boiler with water must be complete. Before filling the installation, adjust the installation will come to be pushed against Non-observance of this instruction will...
VIII-MAINTENANCE - Possibility of using chemical cleaners with The user is strongly advised to enter into an Operations to be carried out: annual maintenance contract with the installer - Open the fire-box plate spray products. - Clean and check the burner, following the or a specialist company.
Need help?
Do you have a question about the KALINA ARLEQUIN 3C Series and is the answer not in the manual?
Questions and answers