7.4.1
3
2
1
Key
1
Wall template
4
Wall plug
5
Hanging bracket
Flue hole cutting
i
metre (2.5
o
horizontally.
i
by extending the dashed inclined line on the template to the
side wall. This dashed line is drawn at 44mm/metre (2.5
rise from the boiler. Where this line reaches the side wall, a
horizontal line should be marked. The vertical centre line of
a 125mm hole should be drilled irrespective of internal or
external installation.
advise that the installer should supply those which are suitable.
wall template.
Fix the hanging bracket on the wall.
0020085231_02 - 05/10 - Glow-worm
1 3 0
9 0 °
4
5
6
o
)
o
)
7.4.2
Boiler hanging
a
With regards to the Manual Handling Operations,
1992 Regulations, the following lift operation
exceeds the recommended weight for a one
person lift, refer to chapter "Manual Handling".
2
1
Key
1
Boiler
2
Hanging bracket
Lifting the boiler into position, lean the top of the boiler
bracket.
Lower the boiler slowly and engage onto the hanging bracket
INSTALLATION
- 13 -
Need help?
Do you have a question about the Ultracom 24cxi and is the answer not in the manual?
Questions and answers