Section 3: Installing The Fireplace; Step 1 Installing The Vent System; Vent System Approvals - Heat-N-Glo BAY-INS Installer's Manual

Vented gas fireplace heater
Table of Contents

Advertisement

3
Installing
the Insert
5
Step 1
Installing the
Vent System
Vent System Installation Precautions
Before starting installation of vent kits, the installer
should read these instructions and the Vent Kit
Instructions to ensure that a proper vent installation is
completed.
Consult your local Building Codes before beginning
the Installation.
WARNING
THIS GAS INSERT AND VENT
ASSEMBLY MUST BE VENTED
DIRECTLY TO THE OUTSIDE AND
MUST NEVER BE ATTACHED TO A
CHIMNEY SERVING A SEPARATE
SOLID FUEL BURNING APPLIANCE.
EACH GAS APPLIANCE MUST USE A
SEPARATE VENT SYSTEM. COMMON
VENT SYSTEMS ARE PROHIBITED.

Vent System Approvals

Table 1 and Figure 3 through 5 shows the vent
termination caps and systems approved for the use
with these models. Approved vent system
terminations are labeled for identification. 3-inch
diameter listed flexible aluminum or stainless steel gas
vent is used for both the incoming combustion air and
exhaust vent pipes. NO OTHER VENTING
SYSTEMS OR COMPONENTS MAY BE USED.
Detailed installation instructions are included with
each vent termination kit and should be used in
conjunction with this manual.
Horizontal Venting
The vent system on this model CANNOT be
terminated horizontally.
Vertical Venting
The vent pipes MUST be connected to the proper
collars on the unit AND the exhaust vent pipe MUST
be connected to the termination cap or the unit will not
operate. The combustion air vent pipe CAN be
connected to the termination cap or it can terminate
inside the chimney. The bottom opening of the
chimney must be sealed around the vent pipes if the
combustion air vent is NOT connected to the
termination cap. See Figures 3, 4 and 5.
NOTE: The minimum vertical rise (exhaust vent) is 14
feet and the maximum vertical rise is 40 feet. These
dimensions are measured from the starting collars of
the unit to the end of the last section of vent pipe. See
dimension V in Figure 3.
A vertical vent termination system installed on this
model will include one (1) length of 3-inch flexible
vent pipe for the combustion air, one (1) pipe-to-
cap adaptor, one (1) length of 3 inch flexible vent
pipe for exhaust, and one (1) SLK-991DA or SLK-
980D Vertical termination Cap.

Advertisement

Table of Contents
loading

Table of Contents