Aluminized Steel Tube Kits - Schwank STW-JZ Owner's Manual

Car wash & harsh environment
Hide thumbs Also See for STW-JZ:
Table of Contents

Advertisement

26A. BURNER & TUBE KIT ASSEMBLY CHART MODELS STW-JZ / IW
STW-JZ /IW
Models
steel tube/reflector system. These models may be installed to heat commercial / industrial non-
residential outdoor spaces and wet indoor environments.
See models STW-JZ2 / IW2 with Stainless Steel tube kits - next page
BEFORE INSTALLING: ENSURE you have the CORRECT TUBE KIT(s) for the
BURNER INPUT
Tube Kit Gross
Weight (lbs)
Length
INPUT
(Btuh)
10'
45,000
20'
20'
60,000
30'
20'
80,000
30'
40'
30'
110,000
40'
50'
30'
130,000
40'
50'
40'
150,000
155,000
50'
60'
50'
175,000
60'
70'
50'
200,000
60'
70'
Stand-Alone tube kits require no additional tube kits.
Primary tube kits require at least one additional Secondary tube kit.
Secondary tube kits require a Primary tube kit.
FLEXIBLE GAS CONNECTOR (Included in Burner Kit) - MUST INSTALL - see Section 13
USA - Stainless Steel Flexible Gas Connector
130,000 or less:
JL-0771-XX - 1/2"x24"
150,000 or greater:
JL-0771-YY - 3/4"x36"
have a stainless steel water resistant burner enclosure and aluminized
ALUMINIZED STEEL
Stand-Alone Kits
70
120
10'
20'
TS-4510-
TW-1420-
TW-1430-
JZ
JZ
1
1
1
1
TUBE KIT PART # & QUANTITY REQUIRED
Primary Kits +
170
210
165
30'
40'
30'
TW-1040-
TW-F030-
JZ
JZ
JZ
1
1
1
1
1
1
1
1
CANADA - Type 1 Hose Gas Connector
130,000 or less:
JL-0771-RC - 1/2"x36"
150,000 or greater:
JL-0771-RB - 3/4"x36"
47
Secondary Kits
165
120
30'
20'
TW-1030-
TW-0020-
JZ
JZ
1+
1
1+
1
1+
1
1+
1+
1
1+
1+
2
1+
1
1+
1+
2
STW-JZ / IW I&O Manual
165
30'
TW-0030-
JZ
1
1
1
IM101229
RL: 12B- BA
RD: AUG 2013

Advertisement

Table of Contents
loading

This manual is also suitable for:

Stw-jz2Stw-iwStw-iw2IwIw-2

Table of Contents