Power Supply Waveform Check; Main Circuit Electrolytic Capacitor Check - Daikin CTXU25G2V1B Service Manual

Inverter multi system with humidifying g-series
Hide thumbs Also See for CTXU25G2V1B:
Table of Contents

Advertisement

Check
3.5

Power Supply Waveform Check

Check No.08
Check the voltage waveform between power supply terminals on the terminal board for
disturbance using oscillo-tester.
[Fig.1]
3.6

Main Circuit Electrolytic Capacitor Check

Check No.11
164
Check to see if the power supply waveform is a sine wave (Fig.1).
Check to see if there is waveform disturbance near the zero cross (sections circled in Fig.2)
Do not touch the live parts within 10 min. after the breaker is turned off.
Even after that, when you touch the parts, check that there is no DC voltage with a tester.
Check the conductivity with a tester. It is OK if the tester shows good conductivity when pins
are replaced.
Set the tester to the
resistance measuring
range
If the pointer swings
and returns, the
electrolytic capacitor
is OK.
[Fig.2]
If the pointer does not
swing, or does not return,
the electrolytic capacitor is
out of order.
(R3466)
SiBE12-908
Service Diagnosis

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2mxu50gv1bCtxu35g2v1bCtxu42g2v1bCtxu50g2v1b2mxu40gv1b

Table of Contents