Fan Motor Connector Check (Power Supply Cable); Fan Motor Connector Check (Signal Cable) - Daikin REYQ-TA Series Service Manual

Heat recovery 60 hz
Table of Contents

Advertisement

Check

4.11 Fan Motor Connector Check (Power Supply Cable)

CHECK 16
(1) Turn OFF the power supply.

4.12 Fan Motor Connector Check (Signal Cable)

CHECK 17
(1) Turn OFF the power supply.
(2) Measure the resistance between Vcc and each phase of U, V, W, and GND and each phase at
287
Measure the resistance between phases of U, V, W at the motor side connectors (3-core wire)
to check that the values are balanced and there is no short circuiting, while connector or relay
connector is disconnected.
Red
White
Black
the motor side connectors (5-core wire) to check that the values are balanced within the range
of ± 20 %, while connector or relay connector is disconnected.
Furthermore, to use a multimeter for measurement, connect the probe of negative pole to Vcc
and that of positive pole to GND.
5 Gray
4 Pink
3 Orange
2 Blue
1 Yellow
U
Measure the
resistance values
V
between phases
U, V, W.
W
GND
Vcc
Measure the
resistance values
W
between Vcc and
U, V, W, and GND and
U, V, W.
V
U
SiUS371614E
Service Diagnosis

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents