Four-Way Valve Performance Check - Daikin CTXU25G2V1B Service Manual

Inverter multi system with humidifying g-series
Hide thumbs Also See for CTXU25G2V1B:
Table of Contents

Advertisement

Check
3.14

Four-way Valve Performance Check

Check No.31
(Fig. 1)
172
< Caution on resetting the power supply >
∗ Be sure to wait for 30 sec. or more after turning off the power supply.
Turn off the power and turn it on
again.
S80 voltage at
DC 0 V with
outdoor unit on?
YES
Start the heating-mode run.
S80 voltage at DC 130-230
V for 3 sec. after
compressor starts, and
then at about DC 12 ~15V
after that? (Fig. 1)
YES
Disconnect the four way valve coil
from the connector and check the
continuity.
Four way valve
coil resistance at
300 ~ 600 Ω?
YES
Voltage at S80
3 sec.
DC180-280V
DC12~15V
Compressor
ON
NO
∗ Four way valve coil
Cooling / dry : No continuity
Heating : Continuity
NO
NO
Time
SiBE12-908
Replace the outdoor unit
PCB.
Replace the outdoor unit
PCB.
Replace the four way valve
coil.
Replace the four way valve.
(R9462)
Service Diagnosis

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2mxu50gv1bCtxu35g2v1bCtxu42g2v1bCtxu50g2v1b2mxu40gv1b

Table of Contents