placed next to each other (not stacked). Put the insulation blanket on top of the vermiculite
boards as shown in figure 7. Place the insulation weight at the top back center of the insulation
blanket lined up with the flue outlet.
4- Install the second side baffle support (B) on the other side of the firebox.
5- Install the two remaining secondary air tubes and push the baffle assembly towards the back of the
unit.
NOTE: As with all fibrous materials, avoid inhaling any airborne fibers.
Note : Make sure that rear inlet holes are not blocked by the insulation blanket.
Figure 8
/13