Advertisement

Quick Links

The TPS68401EVM is an evaluation board to assist in evaluating the TPS68401 IC as a multifunction LED
driver.
The TPS68401 device is an advanced lighting management unit for handheld devices. It has three
independent channels optimized for driving RGB LEDs. The built-in fractional charge pump boosts the
input voltage to power the LEDs at low input voltage. Channel one can optionally be supplied directly from
the battery voltage to reduce power consumption and improve efficiency.
At the heart of the device is a programmable state machine which executes a lighting program consisting
of up to 16 instructions per channel. Once the program is loaded through the I
fully independent from the main processor resulting in significant system-level power savings. The device
can issue an interrupt to the main processor via the INT pin. The TRIG I/O allows synchronization
between multiple devices. A general-purpose output pin is provided which is addressable through the
serial interface. In addition, the INT pin can also be configured as general-purpose output.
The following related documents are available for download through the Texas Instruments web site
(http://www.ti.com) or via the links below.
SLVU812 – November 2012
Submit Documentation Feedback
TPS68401EVM User's Guide
Figure 1. TPS68401EVM
Table 1. EVM Related Data Sheets
DEVICE
TPS68401
USB-TO-GPIO
Copyright © 2012, Texas Instruments Incorporated
2
C™ interface the device is
LITERATURE NUMBER
SLVSA68
SLLU093
TPS68401EVM User's Guide
User's Guide
SLVU812 – November 2012
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPS68401EVM and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Texas Instruments TPS68401EVM

  • Page 1: Tps68401Evm

    SLVU812 – November 2012 TPS68401EVM User’s Guide The TPS68401EVM is an evaluation board to assist in evaluating the TPS68401 IC as a multifunction LED driver. The TPS68401 device is an advanced lighting management unit for handheld devices. It has three independent channels optimized for driving RGB LEDs.
  • Page 2: Table Of Contents

    List of Figures ......................TPS68401EVM ..................... System Block Diagram ...................... USB-to-GPIO Adapter ................TPS68401EVM Board Layer 1 (SIGNAL) ................... TPS68401EVM Board Layer 2 (GND) ................TPS68401EVM Board Layer 3 (POWER) ................TPS68401EVM Board Layer 4 (SIGNAL) ....................Ribbon Cable Connection ....................
  • Page 3: Introduction

    INTRODUCTION Description The Texas Instruments TPS68401 evaluation module (EVM) helps designers to evaluate TPS68401 advanced lighting management unit for handheld devices. These devices have three independent channels optimized for driving RGB LEDs. The built-in fractional charge pump boosts the input voltage to power the LEDs at low input voltage.
  • Page 4: System Overview

    The system consists of the following components: Host (PC)— A Windows personal computer (PC) – used to configure and monitor the TPS68401EVM. ® The GUI operates on the host. For the GUI to execute properly, the host needs to have the correct LabViewTM RunTimeTM version.
  • Page 5: Board Layout

    BOARD LAYOUT www.ti.com BOARD LAYOUT Figure 4. TPS68401EVM Board Layer 1 (SIGNAL) SLVU812 – November 2012 TPS68401EVM User’s Guide Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 6: Tps68401Evm Board Layer 2 (Gnd)

    BOARD LAYOUT www.ti.com Figure 5. TPS68401EVM Board Layer 2 (GND) TPS68401EVM User’s Guide SLVU812 – November 2012 Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 7: Tps68401Evm Board Layer 3 (Power)

    BOARD LAYOUT www.ti.com Figure 6. TPS68401EVM Board Layer 3 (POWER) SLVU812 – November 2012 TPS68401EVM User’s Guide Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 8: Tps68401Evm Board Layer 4 (Signal)

    BOARD LAYOUT www.ti.com Figure 7. TPS68401EVM Board Layer 4 (SIGNAL) TPS68401EVM User’s Guide SLVU812 – November 2012 Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 9: Hardware Overview

    The TRIG I/O allows synchronization between multiple devices. The TPS68401EVM can be configured and monitored through a Windows GUI application running on a PC. The GUI communicates with the TPS68401EVM through the USB Interface Adapter (included with EVM kit), which acts as an I C master for the board.
  • Page 10: Jumpers

    HARDWARE OVERVIEW www.ti.com Connecting the ribbon cable to TPS68401EVM pin one is marked on the EVM and with the red stripe in the ribbon cable. Figure 8. Ribbon Cable Connection Jumpers The TPS68401EVM operation can be configured using jumpers: •...
  • Page 11: Software

    SOFTWARE www.ti.com SOFTWARE The TPS68401EVM comes with a Windows application that can be used to configure and monitor the EVM. The GUI can be used to configure all available options of the EVM such as programming and current settings. The following section explains the procedure for installing the graphical user interface (GUI) onto a Windows based PC.
  • Page 12: Tps68401Evm Gui Main

    SOFTWARE www.ti.com Figure 10. TPS68401EVM GUI Main TPS68401EVM User’s Guide SLVU812 – November 2012 Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 13: Schematic And Bill Of Materials

    SCHEMATIC AND BILL OF MATERIALS www.ti.com Figure 11. TPS68401EVM GUI Basic SCHEMATIC AND BILL OF MATERIALS The following pages contain the TPS68401EVM board schematic and bill of materials. SLVU812 – November 2012 TPS68401EVM User’s Guide Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 14 OsramRGB-LED LRTB R98G CLK32K TP28 B (A) B (A) B (C) B (C) CLK32K TPS68401 TRIG TP29 TRIG GPO2 OsramRGB-LED LRTB R98G CLK32K CLK32K TRIG TRIG TPS68401EVM User’s Guide SLVU812 – November 2012 Submit Documentation Feedback Copyright © 2012, Texas Instruments Incorporated...
  • Page 15 SCHEMATIC AND BILL OF MATERIALS www.ti.com Table 3. TPS68401EVM Bill of Materials Item No. Designator Value Size Manufacturer Part No. Description C1, C2, C3, C4, C10, C11, 0.47uF Panasonic ECJ0EB0J474K Capacitor, Ceramic, 10V, X5R C12, C13 C5, C6, C8, C9, C14, C15, 1.0uF...
  • Page 16 Any exceptions to this are strictly prohibited and unauthorized by Texas Instruments unless user has obtained appropriate experimental/development licenses from local regulatory authorities, which is responsibility of user including its acceptable authorization.
  • Page 17 FCC Interference Statement for Class B EVM devices This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications.
  • Page 18 Also, please do not transfer this product, unless you give the same notice above to the transferee. Please note that if you could not follow the instructions above, you will be subject to penalties of Radio Law of Japan. Texas Instruments Japan Limited (address) 24-1, Nishi-Shinjuku 6 chome, Shinjuku-ku, Tokyo, Japan http://www.tij.co.jp...
  • Page 19 FDA Class III or similar classification, then you must specifically notify TI of such intent and enter into a separate Assurance and Indemnity Agreement. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2012, Texas Instruments Incorporated...
  • Page 20: Important Notice

    IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, enhancements, improvements and other changes to its semiconductor products and services per JESD46, latest issue, and to discontinue any product or service per JESD48, latest issue.

Table of Contents