This User's Guide describes the characteristics, operation, and use of the
TPS63000EVM evaluation module (EVM). This EVM is designed to help the user easily
evaluate and test the operation and functionality of the TPS63000. This User's Guide
includes setup instructions for the hardware, a schematic diagram, a bill of materials
(BOM), and PCB layout drawings for the evaluation module.
1
2
3
4
1
2
3
4
5
6
7
8
9
1
2
1
Introduction
The Texas Instruments TPS63000 is a high efficient single inductor buck-boost converter in a 10-pin,
3-mm × 3-mm QFN package. Both fixed and adjustable output voltage units are available.
1.1
Background
The TPS63000EVM-148 uses the TPS63000 adjustable version, and is set to 3.3-V output. The EVM
operates with full-rated performance with an input voltage between 3.0 V and 5.5 V.
1.2
Performance Specification
Table 1
provides a summary of the TPS63000EVM-148 performance specifications. All specifications are
given for an ambient temperature of 25°C.
SLVU156 - March 2006
Submit Documentation Feedback
..........................................................................................
..................................................................................
........................................................................................
...................................................................
List of Figures
.....................................................................
............................................................................
............................................................................
................................................................
....................................................................
.....................................................................................
..................................................................................
..............................................................................
...................................................................
List of Tables
............................................................
.............................................................
User's Guide
SLVU156 - March 2006
TPS63000EVM-148
TPS63000EVM-148
1
2
6
8
3
4
4
5
5
6
7
7
8
2
9
1
Need help?
Do you have a question about the TPS63000EVM-148 and is the answer not in the manual?
Questions and answers