Download Print this page
Texas Instruments TPS6030 EVM-170 Series User Manual
Texas Instruments TPS6030 EVM-170 Series User Manual

Texas Instruments TPS6030 EVM-170 Series User Manual

Single-cell charge pump evaluation module

Advertisement

Quick Links

TPS6030x EVM-170
Single-Cell Charge Pump
Evaluation Module
User's Guide
2001
Mixed-Signal Products
SLVU034

Advertisement

loading
Need help?

Need help?

Do you have a question about the TPS6030 EVM-170 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TPS6030 EVM-170 Series

  • Page 1 TPS6030x EVM-170 Single-Cell Charge Pump Evaluation Module User’s Guide 2001 Mixed-Signal Products SLVU034...
  • Page 2 IMPORTANT NOTICE Texas Instruments and its subsidiaries (TI) reserve the right to make changes to their products or to discontinue any product or service without notice, and advise customers to obtain the latest version of relevant information to verify, before placing orders, that information being relied on is current and complete. All products are sold subject to the terms and conditions of sale supplied at the time of order acknowledgment, including those pertaining to warranty, patent infringement, and limitation of liability.
  • Page 3 IMPORTANT NOTICE Texas Instruments and its subsidiaries (TI) reserve the right to make changes to their products or to discontinue any product or service without notice, and advise customers to obtain the latest version of relevant information to verify, before placing orders, that information being relied on is current and complete. All products are sold subject to the terms and conditions of sale supplied at the time of order acknowledgment, including those pertaining to warranty, patent infringement, and limitation of liability.
  • Page 4 Chapter 3—Capacitor Selection and Measurements Related Documentation From Texas Instruments The evaluation module (EVM) for the new Texas Instruments (TI) TPS60300 to TPS60303 charge pump devices helps designers evaluate these devices. With these EVMs it is possible to evaluate all different modes of the devices as well as their performance.
  • Page 6: Table Of Contents

    Running Title—Attribute Reference Contents Introduction ..............Basic Operation of the Device .
  • Page 8: Introduction

    Chapter 1 Introduction The Texas Instruments TPS6030x charge pumps are regulated voltage converters intended for use with a single NiCd, NiMH, or alkaline cell. The TPS60300 and TPS60302 have an output voltage of 3.3 V from an input signal between 0.9 V and 1.8 V. The TPS60301 and TPS60303 have an output voltage of 3 V from an input voltage between 0.9 V and 1.8 V.
  • Page 9: 1.1 Basic Operation Of The Device

    1.1 Basic Operation of the Device The TPS6030x series are charge pumps working either in a tripler or in a quadrupler mode. They consist of an unregulated doubler stage with its capacitors C FLY1 . Its output voltage can be found at OUT1. The voltage at OUT1 is OUT1 internally connected to the input of a regulated charge pump that works in a ×1.5 or ×2 mode, respectively.
  • Page 10: Evm Description

    Chapter 2 EVM Description This chapter contains a description and layout of the EVM. Topic Page EVM Schematic ..........EVM Layout .
  • Page 11: Evm Schematic

    2.1 EVM Schematic Figure 2−1. EVM Schematic C1, C6 0.9 V to 1.9 V 1 µF 1 MΩ Power ENABLE Good C1− 1 MΩ C2, C7 C2− TPS60302 1 µF C3, C8 (Not 1 µF Assembled) OUT1 OUT2 O(OUT2) O(OUT1) C4, C9 C5, C10 C1206...
  • Page 12: Evm Layout

    2.2 EVM Layout Figure 2−2. EVM Board Layout Figure 2−2 shows the placement of the components of the EVM. Components are only placed on the top layer of the board. The size of the EVM is 42,0 x 33,0 mm (1386 mm ), which is much larger than required for the IC and its capacitors.
  • Page 13: Setup Of The Evm

    Bill of Materials 2.3 Setup of the EVM For proper operation of the EVM, use the following steps: 1) Connect a load to the output (between GND and OUT2). TPS60300, TPS60302: >165 Ω or 0 mA to 20 mA at VIN ≥ 1.1 V >330 Ω...
  • Page 14: Capacitor Selection And Measurements

    Chapter 3 Capacitor Selection and Measurements This chapter gives the selection and measurements for the capacitors. Topic Page Capacitor Selection and Measurements ......Capacitor Selection and Measurements...