Fuel Conversion; Tools Required - Jøtul Allagash GF3 DVII Installation And Operation Instructions Manual

Direct vent gas heater
Table of Contents

Advertisement

Fuel Conversion

The Allagash gas stove is shipped from the factory
equipped as a NATURAL GAS unit; However, the
stove is shipped with the necessary gas conversion
kit to convert the stove to burn propane gas. The kit
contains all the necessary components needed to
complete the conversion and ensure safe operation,
including Conversion Notice labels that must be
affixed to the stove and stove Rating Plate.
THE CONVERSION KIT IS TO BE IN-
STALLED BY AN AUTHORIZED JØTUL
SERVICE TECHNICIAN IN ACCORDANCE
WITH THE MANUFACTURER'S INSTRUC-
TION AND ALL CODES AND REQUIRE-
MENTS OF THE AUTHORITY HAVING
JURISDICTION. FAILURE TO FOLLOW
THESE INSTRUCTIONS COULD RESULT IN
SERIOUS INJURY OR PROPERTY DAMAGE.
THE QUALIFIED AGENCY PERFORMING
THIS WORK ASSUMES RESPONSIBILITY
FOR THIS CONVERSION.

Tools required:

• 1/4" Nut driver
• 1/2" open end wrench • Torx T-20 or slot head
Kit Contents:
1, Regulator Tower labeled for propane
3, Regulator Tower screws
1, Burner Orifice (1.5 mm for LPG, #38 for NG)
1, Pilot Orifice ( #30 for LPG, #51 for NG)
1, 4 mm Hex Key
Label A - to be completed and applied to the back of
the stove.
Label B - apply to the stove Rating Plate.
IMPORTANT: SHUT OFF THE GAS
SUPPLY AT THE MAIN SUPPLY VALVE
BEFORE BEGINNING THE
CONVERSION.
If a blower is installed, be sure to
disconnect the power cord before
proceeding with this conversion.
12
WARNING:
• 7/16" open end wrench
screwdriver.
IN CANADA: THE CONVERSION SHALL BE CARRIED
OUT IN ACCORDANCE WITH THE REQUIREMENTS OF
THE PROVINCIAL AUTHORITIES HAVING JURISDIC-
TION AND IN ACCORDANCE WITH THE REQUIRE-
MENTS OF THE CAN1-B149.1 AND .2 INSTALLATION
CODE.
Gas Conversion Procedure
1. Turn off gas supply to the stove.
2. Open the front doors.
3. Remove the stove top plate.
4. Release the glass clips atop the stove and
slowly lift glass panel up and off of the firebox.
5. Carefully remove the logs and set out of the way.
6. Remove burner tube: Lift out the log support plate.
Using a ¼" nut driver remove the two screws se-
curing the burner tube (17, pg. 22) to the stove
bottom. Lift out the burner tube.
7. Change the main burner orifice (32, pg 22 and
Fig. 12). Using a ½" open end wrench, remove
the burner orifice and replace with the appropri-
ate orifice, supplied in the kit.
Natural gas - #38
Propane - 1.5 mm DMS
8. Adjust the air shutter on the burner tube to
allow for the proper mixing of air and gas. See
Fig. 12.
Natural - Three-quarters OPEN.
Propane - FULL OPEN
9. Change the pilot orifice. From within the firebox,
pull the spring clip back and remove the Pilot
Head from the Pilot Base. Use the 4 mm hex key
to remove the old Pilot Orifice from the base
(counterclockwise). See Fig. 13.
NOTE: The Air Shutter should never be set LESS
than 1/8" open.
Burner Tube
Air
Shutter
Figure 12. Burner Orifice and Air Shutter. Shutter is
shown in the fully open position.
Burner Orifice

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents