Optional Equipment
8
Remove and discard the screws (see "a" below) holding the stock regulator in place (see "b" below).
Remove the stock regulator and gasket (see "c" below). Place the LP regulator in place, making sure
the pre-fitted gasket (see "c" below) is in place.
NOTE: There is a label on the base of the regulator knob indicating regulator type (NG or LP).
Secure the regulator with the screws included with the regulator – tighten to 25 lb-in of torque. Place
the included label on the valve body where it can be easily seen to insure proper identification.
NOTE: Leak test this area after the heater is installed, gas is connected, and the main burner
is lit.
d
9
Make the gas line connection, bleed the gas line (if applicable), start the heater and thoroughly leak-
test all gas connections and the gas control valve.
© Travis Industries
a
b
4121129
(for qualified installers only)
T-20 Torx or
Slotted Screwdriver
43
c
100-01314