Mantel And Wall Projections - Heat & Glo SL-550BE-M-IPI Owner's Manual

Table of Contents

Advertisement

B. Mantel and Wall Projections
WARNING! Risk of Fire! Comply with all minimum clear-
ances to combustibles as specifi ed. Framing closer than the
minimums listed must be constructed entirely of noncom-
bustible materials (i.e., steel studs, concrete board, etc.)
Failure to comply could cause fi re.
Note: All
measurements
in inches.
3
Figure 13.12 Clearances To Combustibles Mantels Or Other
Combustibles Above Appliance
TOP VIEW
2-7/8 IN.
MINIMUM
Note: Clearance from opening
to perpendicular wall.
Figure 13.13 Combustible Mantel Leg or Wall Projections
(Acceptable on both sides of opening)
56
CEILING
12
11
10
9
8
7
32
6
5
13
4
12
11
10
9
8
7
6
5
4
TOP OF HOOD OR FIREPLACE OPENING
1/2 IN.
MINIMUM
3 FT. MAXIMUM
Heat & Glo • SL-550BE-M-IPI • 2188-900 Rev. H • 11/10
TOP VIEW
5-3/8 IN.
MINIMUM
Note: Clearance from opening
to perpendicular wall.
Figure 13.14 Combustible Mantel Leg or Wall Projections
(Acceptable on both sides of opening)
3-1/2 in.
1/2 in.
NON-COMBUSTIBLE ZONE
Figure 13.15 Non-Combustible Zone
3 IN.
MINIMUM
UNLIMITED
1/2 in. THICK WALL
SHEATHING

Advertisement

Table of Contents
loading

Table of Contents