Mantel And Wall Projections - Heat & Glo SL-550BE-M-IPI Owner's Manual

Table of Contents

Advertisement

D. Mantel and Wall Projections
WARNING! Risk of Fire! Comply with all minimum clear-
ances to combustibles as specifi ed. Framing or fi nishing
material closer than the minimums listed must be construct-
ed entirely of noncombustible materials (i.e., steel studs,
concrete board, etc).
All measurements
are in inches.
6
5
4
3
TOP OF HOOD OR FIREPLACE OPENING
Figure 5.3 Clearances to mantels or other combustibles
above appliance
3-1/2 in.
1/2 in.
NON-COMBUSTIBLE ZONE
Figure 5.4 Non-Combustible Zone
20
CEILING
12
11
10
9
8
7
13
12
11
10
9
8
7
6
5
4
1/2 in. THICK WALL
SHEATHING
Heat & Glo • SL-550BE-M-IPI • 2188-900 Rev. H • 11/10
TOP VIEW
Note: Clearance from opening
to perpendicular wall.
Figure 5.5 Clearances to Mantel Legs or Wall Projections
32
TOP VIEW
Note: Clearance from opening
to perpendicular wall.
Figure 5.6 Wall Projection (Acceptable on one side of opening)
2-7/8 IN.
MINIMUM
3 FT. MAXIMUM
(Acceptable on both sides of opening)
5-3/8 IN.
MINIMUM
UNLIMITED
1/2 IN.
MINIMUM
3 IN.
MINIMUM

Advertisement

Table of Contents
loading

Table of Contents