Installation Preparation; Tools And Materials Required; Remove Packaging - GE ZKD910 Installation Instructions Manual

27" and 30" warming drawers
Table of Contents

Advertisement

TOOLS REQUIRED
Hand Saw
Drill and
1/16" Bit
Phillips Screwdriver

REMOVE PACKAGING

•Place carton on a flat surface.
•Open one end of the carton and lift
off the top piece.
•Lift the warmer up and out of the carton.
•Place the drawer on top of the shipping carton to
protect the drawer front and the finished flooring.

Installation Preparation

Safety Glasses
Measuring Tape
Level
•Remove all packing materials and tape.
•Locate package containing 4 wood screws
and set aside.
Parts provided:
•4 Wood Screws.
6
MATERIALS REQUIRED (provided)
4 Wood Screws
MATERIALS REQUIRED (not provided)
2x2 or 2x4
Wood Block
for Anti-Tip
Security
Adhesive or other hardware for installing
runners or shelf to support warmer drawer
Runners must be level, rigidly mounted
and capable of supporting 150 pounds.
2x2 or 2x4
Lumber for
Runners

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ztd910Monogram zkd910Monogram ztd910

Table of Contents