Installation Preparation; Tools And Naterials Required; Remove Packaging - GE ZKD910 Installation Instructions Manual

27" and 30" warming drawers
Table of Contents

Advertisement

Installation Preparation
TOOLS REQUIRED
Hand Saw
Drill and
1/16" Bit
Phillips Screwdriver
Safety Glasses
Measuring Tape
Level
MATERIALS REQUIRED (provided)
/4Wood Screws
MATERIALS REQUIRED (not provided)
2x2 or 2x4
2x2 or 2x4
Wood Block
Lumber for
for Anti-Tip
_
Runners
Security
Adhesive or other hardware for installing
runners or shelf to support warmer drawer
Runners must be level, rigidly mounted and capable
of supporting
150 pounds.
REMOVE
PACKAGING
, Place carton on a flat surface.
,Open one end of the carton and lift off the top
piece.
, Lift the warmer
up and out of the carton.
,Place the drawer on top of the shipping carton to
protect the drawer front and the finished flooring.
, Remove all packing materials and tape.
, Locate package containing q wood screws and set
aside.
Parts provided:
, q Wood Screws.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ZKD910 and is the answer not in the manual?

This manual is also suitable for:

Ztd910

Table of Contents