Vent Requirements; Altitude Considerations - Lopi Heritage Owner's Manual

Heritage stove lopi
Hide thumbs Also See for Heritage:
Table of Contents

Advertisement

Installation

Vent Requirements

!
Always maintain the required 1" clearance (air space) to combustible materials to prevent a fire hazard.
Do not fill air spaces with insulation.
!
The gas appliance and vent system must be vented directly to the outside of the building, and never
be attached to a chimney serving a separate solid fuel or gas-burning appliance. Each direct vent gas
appliance must use it's own separate vent system.
• This appliance is equipped only for
altitudes 0-2000 feet. However, our
in-house testing has shown that the
unit operated at altitudes to 8000 ft.
!
Failure to adjust the air shutter
properly may lead to improper
combustion which can create a safety
hazard. Consult your dealer or
installer if you suspect an improperly
adjusted air shutter.
When the vent passes through a wall,
a wall thimble is required. When the
vent passes through a ceiling, a
support box or firestop is required.
When the vent passes through the
roof, a roof flashing and storm collar
are required. Follow the instructions
provided with the vent (from
Duravent®) for installing these items.
Use of of the following 6-5/8" diameter co-axial gas direct vent systems:
Manuafacturer
Simpson Dura-Vent
Selkirk Hearth Products
American Metal Products
Metal-Fab Inc.
N O T E : Always use the high-wind cap for the type of vent you are using (if applicable)
Slide the vent sections together and turn 1/4 turn until the sections lock in place.
Screws are not required to secure the vent. However, three screws may be used to
secure vent sections together if desired.
High temperature sealant is recommended at the appliance starter section connection
(use high-temperature silicone or Mill-Pac®).
If disassembly is required, at time of re-assembly check to see if the vent creates a tight
fit. If it does not, apply high temperature sealant to the joints of the affected sections.
Horizontal sections require a 1/4" rise every 12" of travel
Horizontal sections require non-combustible support every three feet (e.g.: plumbing
tape)
Travis Industries
(for qualified installers only)
Vertical Termination NOTE:
always use the "high-wind"
version (if applicable)
Use a roof flashing and storm collar
whenever passing through the roof
Use a firestop spacer whenever
passing through a ceiling
Minimum framing
for fire stop
8-5/8"
Use a support box
on exposed vent
Use a firestop whenever
passing through a wall
8-5/8"
Minimum
Framing for
wall thimble
Maintain a minimum 1"
clearance from vent to any
combustible.
Series
Model GS
Direct-Temp
Ameri-Vent
Direct-Vent with 4DHT or 4DVT Cap
100-01135
9
Vertical Vent
Requirements
Maintain a minimum 1"
clearance from vent to
any combustible
Horizontal Vent
Requirements
Horizontal Termination
4 0 4 0 8 0 9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Heritage ef iii

Table of Contents