Termination Requirements (see the illustration below)
A
Minimum 9" clearance from any door or window
B
Minimum 12" above any grade, veranda, porch, deck or balcony
C
Minimum 12" from outside corner walls
D
Minimum 12" from inside corner walls
E
Minimum 11" clearance below unventilated soffits or roof surfaces
Minimum 18" clearance below ventilated soffits
Minimum 6" clearance from roof eaves
NOTE: Vinyl surfaces require 24"
F
Minimum 18" clearance below a veranda, porch, deck or balcony (must have two open sides)
G Minimum 48" clearance from any adjacent building
H
Minimum 84" clearance above any grade when adjacent to public walkways or driveways
NOTE: may not be used over a walkway or driveway shared by an adjacent building
I
Minimum 48" clearance from any mechanical air supply inlet
J
Minimum 36" clearance above and 48" below and to the sides of non-mechanical air supply inlet
K
Minimum 36" from the area above the meter/regulator (vent outlet)
L
Minimum 36" from the meter/regulator (vent outlet)
M Minimum 12" above the roof line (for vertical terminations)
N
Minimum 24" horizontal clearance to any surface (such as an exterior wall) – for vertical terminations
G
NOTE: Measure clearances to the nearest edge of the exhaust hood.
Use the vinyl siding standoff (#950) when installing on an exterior with vinyl siding.
Vent termination must not be located where it will become plugged by snow or other material
These clearances meet UMC-1994 standards.
Travis Industries
(for qualified installers only)
E
N
M
K
A
F
D
L
100-01135
E
I
C
B
Roof
Surface
11" Min.
6" Min.
E
A
J
H
4 0 4 0 8 0 9
Roof
Eaves

Advertisement

Table of Contents
loading

This manual is also suitable for:

Heritage ef iii

Table of Contents