Installation Of Soapstone (Rais Mino Soapstone) - RAIS RONDO User Manual

Table of Contents

Advertisement

ENGLISH
RAIS - Manual for RONDO & MINO II
Installation of soapstone (RAIS Mino II Soapstone)
List of materials (individual components for assembling soapstone)
Item number
Product designation
9057001/9057002
Top plate without hole
9057004
Baking compartment stone
5057006
Right side stone
9057007
Left side stone
9050118 grey/black
Fitting for soapstone, right
9050109 grey/black
Fitting for soapstone, left
0110-M5x12distance pole
M5x12 distance pole
0110-M5 flange nut
M5 flange nut
0110-M5x40 pivot
M5x40 pointed screw
0110-M5x10 hexagon
M5x10 hexagon socket head cap screw, low
socket head cap screw, low
head
head
70-03
Spring hold
14
ENGLISH
RAIS - Manual for RONDO & MINO II
Assembly of soapstone sides
Install the fitting for the soapstone as well as the spring square using the supplied low-
head screws. Ensure that the left fitting is used for the left side stone.
Install the right fitting on the right soapstone in the same way.
Number
1/1
1
1
1
1
1
2
2
2
2
2
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mino iiMino ii soapstone

Table of Contents