Operational Check; Airflow; Maintenance; Stacking - White Knight ECO 83A Installation And Service Instructions Manual

Low carbon dryer
Hide thumbs Also See for ECO 83A:
Table of Contents

Advertisement

6. OPERATIONAL CHECK

6.1 Remove the pressure test point screw from the gas
tee connection at the back of the dryer and connect
a gas pressure gauge.
6.2 Check that the selector switch is set to 'Extra dry',
and that the heat switch is set to 'high'.
Remove anything from inside the drum, check that
the lint filter is fitted, shut the dryer door.
6.3 Turn on the gas, push the electric plug into the socket
switch on the electricity supply, and push the start
button.
6.4 Check for ignition. If the gas fails to remain lit then
repeatedly (open and close the door) and press start
switch. Run the machine for periods of at least 30
seconds until the air is removed from the system and
burning is continuous.
Note that Gas is not lit when the drum is turning
anti-clockwise.
6.5 With the gas burning ensure that the pressure is as
detailed in the Technical Data. Turn off and replace
the pressure test point screw. Check for soundness.
6.6 Switch on again and re-start so that the gas is
burning.Disconnect the flexible gas hose and check
that the solenoids can be heard to close. After 30
seconds turn on the gas and check that there is no
re-ignition. Switch the machine off and on again and
check for re-ignition.
6.7 Check that the operation of the machine does not
cause spillage of products of combustion from any
open flued gas appliance in the same room, or from
appliances in adjoining rooms, e.g. a gas fire or
central heating boiler.
6.8 In the event of an electrical fault after installation of
the appliance, preliminary electrical system checks
must be carried out (i.e. earth continuity, polarity and
resistance to earth).
6.9 IMPORTANT INFORMATION RE-FUNCTIONING
OF THE FULL SEQUENCE FLAME CONTROL
BOX.
THE FULL SEQUENCE FLAME CONTROL BOX
ON THIS APPLIANCE REQUIRES A 6 SECOND
RE-SET PERIOD FOLLOWING EACH
INTERRUPTION OF INPUT VOLTAGE.
6 SECONDS DELAY IS REQUIRED BETWEEN
EACH ATTEMPT TO RESTART THE APPLIANCE
FOLLOWING SWITCHING IT OFF, OR AFTER
OPENING THE DOOR.
7

AIRFLOW

It is most important that airflow to the plinth is not
restricted.
8

MAINTENANCE

This appliance does not require an annual service
unless it is required as part of a landlord's gas safety
certificate.
If you do have any maintenance activity carried out, it
should be carried out by a competent person (i.e.
registered).
9

STACKING

Instructions for stacking, if required, are supplied with
the stacking kit.
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents