JVC XV-N50BK Service Manual page 13

Hide thumbs Also See for XV-N50BK:
Table of Contents

Advertisement

2.2.4 Removing the loading motor (See Figure 10 and Figure 11)
• Prior to the following procedure, remove the tray, the traverse
mechanism assembly, and the elevator.
(1) Remove the belt from the pulley.
(2) Remove two screws C attaching the loading motor.
(3) Remove two solders h on the switch board.
Belt
C
Pulley
Fig.10
Switch board Part h
Fig.11
XV-N50BK,XV-N55SL
Loading base
Pulley
Slide cam
C
Loading motor
(No.A0041)1-13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xv-n55sl

Table of Contents