HP BladeSystem c7000 Maintenance And Service Manual page 56

Enclosure for server blade
Hide thumbs Also See for BladeSystem c7000:
Table of Contents

Advertisement

Route the cable between the Insight Display signal pass-thru board pin guide and the screw mounts. Be
2.
careful not to pinch the cable between the Insight Display signal pass-thru board and the screw mount
as shown in the following figure.
Place the Insight Display signal pass-thru board properly over the guide pin and the screw mount and
3.
screw the Insight Display signal pass-thru board to the rear cage assembly.
To verify the enclosure serial number:
CAUTION:
Failure to complete the following procedure might cause inaccurate or incomplete
information to appear in HP SIM and Onboard Administrator.
Using the Insight Display, navigate to the Enclosure Info screen.
1.
Verify that the enclosure serial number matches the enclosure serial number on the label on the
2.
enclosure mounting bracket.
If the enclosure serial number matches the label, continue to step 7.
o
If the enclosure serial number does not appear or does not match the label, continue to step 3 to
o
manually update the enclosure identity using the Onboard Administrator CLI.
Use the Onboard Administrator service port address found on the Enclosure Info screen to log in to the
3.
Onboard Administrator CLI with the Administrator local account password by using one of the
following options:
A serial cable attached to the Onboard Administrator serial port
o
An Ethernet CAT5 cable attached to the enclosure service port that is the enclosure link uplink port
o
Enter the SET ENCLOSURE PART_NUMBER X command, where X represents the 10-digit enclosure PID
4.
number found on the enclosure front label.
Enter the SET ENCLOSURE SERIAL_NUMBER Y command, where Y represents the 10-digit serial
5.
number found on the enclosure front label.
Enter the SET ENCLOSURE PDU_TYPE Z command, where Z represents the number of the appropriate
6.
power configuration:
1—Single phase power, U.S.
o
2—Three-phase power, U.S.
o
3—Three-phase power, International
o
Removal and replacement procedures 56

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents