Process Data Control COMPASS-EI User Manual page 30

Compliance assurance system emissions inventory module
Table of Contents

Advertisement

m.) Control Pressure.
The breather vent pressure setting. (psia)
n.) Primary Seal.
Mechanical Shoe
Liquid Mount (Resilient Seal)
o.) Secondary Seal.
Shoe Mounted
Rim Mounted
Weather Shield
p.) No of Columns.
The number of columns in the Tank.
q.) Deck Fitting Category.
Typical
r.) Deck Type.
Welded
s.) Deck Construction.
Sheet
t.) Deck Seam Type.
5 X 7.5 FT (Panel)
5 FT (Sheet)
u.) Deck Seam Length.
The deck seam length in feet.
17. Combustion Unit Equipment (Mandatory).
Equipment Type: Combustion.
a.) Equipment Profile (Mandatory).
Boiler
Heater
IC Engine
Turbine
Flare
Boiler/Electric Generatn
I.C. Engine/Electric Generatn
COMPASS-EI–Manual – Chapter 4
Vapor Mount (Resilient Seal)
Other
Other
None
Detailed
Bolted
Panel
5 X 12 FT (Panel)
7 FT (Sheet)
Kiln
Furnace
Dryer
Incinerator
Oven
Fluid Cat. Cracking Unit
Turbine/Electric Generatn
Page 27

Advertisement

Table of Contents
loading

Table of Contents