Download  Print this page

Husqvarna HCS9, HCS13 Operator's Manual page 13

Collection system
Hide thumbs

Advertisement

18.
Remove the discharge chute from the deck.
19.
Place the deck plate pin in the tube on the
back edge of the deck. Rotate the blower
around and into place. Figure 3.
20.
Install the pin thru the tabs on both the deck
and the blower. Figure 3.
21.
Latch the idler arm in the idler keeper.
Figure 3.
22.
Install the belt on the deck pulley and
release the idler arm from the keeper.
23.
Install the new belt shield.
24.
Place the hose on the blower housing and
secure with the over center hose clamp.
ASSEMBLY
ROTATE
IDLER ARM
IDLER KEEPER
13
DECK PLATE PIN
TUBE
FIGURE 3

Advertisement

Table of Contents
loading

  Related Manuals for Husqvarna HCS9, HCS13

This manual is also suitable for:

111280111281