Commissioning - Mira escape Installation & User Manual

Thermostatic electric shower
Table of Contents

Advertisement

Commissioning

Before.carrying.out.the.commissioning.procedure.install.the.Shower.Fittings,.
refer.to.the.Shower.Fittings.Installation.and.User.Guide.
If you are unsure how an electric shower works, please read through the section
"User.Instructions" before continuing.
1.
Electrical supply is turned
off at the mains.
4.
Check for water leaks.
7.
Press the 'Start/Stop'
button, light on the button
comes on
2.
Turn control to full cold.
5.
Set control to 'I'.
8.
0 - 5 Secs
Water will be at full force and
at a cool temperature.
4
3.
Turn the water supply
fully on.
6.
S w i t c h o n e l e c t r i c a l
supply.
9.
Turn the control slowly.
Temperature remains cool
and flow is reduced

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents