Bleeding The Heating System - DeDietrich MCA 15 User Manual

Wall-hung gas condensing boilers
Hide thumbs Also See for MCA 15:
Table of Contents

Advertisement

5. Checking and maintenance
2
2 bar
1
5.4

Bleeding the heating system

T000184-A
27
6. Open the disconnector valves.
1
T001618-A
7. Close the disconnector valves when the manometer indicates a
pressure of 2 bar.
2
T001619-A
8. After filling the installation, switch the boiler on.
It is essential that you bleed any air in the calorifier, the conduits or
the taps to prevent the annoying noises likely to be produced during
heating or when tapping water. To do this, proceed as follows:
1. Open the valves on all radiators connected to the heating system.
T000181-B
2. Set the heating set point to as high a temperature as possible.
3. Wait until the radiators are hot.
4. Switch the boiler off.
When water is added, air gets into the heating system.
Degas the installation. After the air has been vented, the
water pressure can drop below the required level. Check
the water pressure in the heating system. If the water
pressure is lower than 0,8 bar, more water should be
added.
Filling and bleeding the installation 2 times a year should
be sufficient to obtain an adequate hydraulic pressure. If it
is often necessary to top up the installation with water,
contact your fitter.
MCA 15 - MCA 25 MCA 25/28 MI
23/08/2011 - 300024159-001-B

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mca 28 miInnovens mca 25Innovens mca 25 mi

Table of Contents