Mitsubishi Electric MXZ-2C30VA Service Manual page 115

Split-type air conditioners outdoor unit
Hide thumbs Also See for MXZ-2C30VA:
Table of Contents

Advertisement

OPERATING PROCEDURE
5. Removing the control P.C. board, the reactor and
the power board
(1) Remove the top panel and the service panel (Photo 1).
(2) Disconnect the connectors on the control P.C. board.
Remove the screws of the control P.C. board, and
remove the control P.C. board.
(3) Remove the screws of the reactor cover, and remove the
reactor cover.
(4) Remove the screws of the reactor, and remove the reactor.
(5) Remove the screws of the power board, and remove the
power board.
Photo 11
Screws of the power
board
Screws of the reactor
Photo 9
Screws of the
control P.C. board
Photo 10
Screws of the reactor cover
115
PHOTOS

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents