Mitsubishi Electric MXZ-2C30VA Service Manual page 111

Split-type air conditioners outdoor unit
Hide thumbs Also See for MXZ-2C30VA:
Table of Contents

Advertisement

OPERATING PROCEDURE
4. Removing the expansion valve
(1) Remove the top panel (Photo 1,2).
(2) Remove the service panel (Photo 1).
(Gas recovery is not required if the unit is pumped down.)
(3) Remove the font panel for removing LEV F (Photo 1).
(4) Remove the electrical parts for removing LEV F (Photo 3).
(5) Remove the LEV coils.
(6) Detach the brazed parts of expansion valves and pipes.
5. Removing the reactor
(1) Remove the top panel (Photo 1).
(2) Disconnect the reactor lead wire.
(3) Remove the screws of the reactor, and remove the reactor.
Photo 7
LEV coils
Photo 8
111
PHOTOS
LEV coil F
Expansion valve F
Expansion
valves
Screws of the reactor

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents