Rack Warnings; Identifying The Contents Of The Server Shipping Carton; Installing Hardware Options; Installing The Server Into The Rack - HP ProLiant DL380 Generation 4 User Manual

Hp proliant dl380 generation 4 server
Table of Contents

Advertisement

Rack warnings

WARNING: To reduce the risk of personal injury or damage to the equipment, be sure
that:
The leveling jacks are extended to the floor.
The full weight of the rack rests on the leveling jacks.
The stabilizing feet are attached to the rack if it is a single-rack installation.
The racks are coupled together in multiple-rack installations.
Only one component is extended at a time. A rack may become unstable if more than
one component is extended for any reason.
WARNING: To reduce the risk of personal injury or equipment damage when unloading
a rack:
At least two people are needed to safely unload the rack from the pallet. An empty
42U rack can weigh as much as 115 kg (253 lb), can stand more than 2.1 m (7 ft)
tall, and may become unstable when being moved on its casters.
Never stand in front of the rack when it is rolling down the ramp from the pallet.
Always handle the rack from both sides.

Identifying the contents of the server shipping carton

Unpack the server shipping carton and locate the materials and documentation necessary for installing the
server. All the rack mounting hardware necessary for installing the server into the rack is included with the
rack or the server.
The contents of the server shipping carton include:
Server
Power cord
Hardware documentation, Documentation CD, and software products
Rack-mounting hardware
In addition to the supplied items, you may need:
Operating system or application software
Hardware options

Installing hardware options

Install any hardware options before initializing the server. For options installation information, refer to the
option documentation. For server-specific information, refer to "Hardware options installation (on page
38)."

Installing the server into the rack

CAUTION: Always plan the rack installation so that the heaviest item is on the bottom of the rack. Install
the heaviest item first, and continue to populate the rack from the bottom to the top.
Install the server and cable management arm into the rack. Refer to the installation instructions that
1.
ship with the 2U Quick Deploy Rail System for more information.
Connect peripheral devices to the server.
2.
Setup 34

Advertisement

Table of Contents
loading

Table of Contents