Test Facility - Allied Telesis AT-9812T V2 Hardware Reference Manual

At-9800 series
Hide thumbs Also See for AT-9812T V2:
Table of Contents

Advertisement

26
Message
FAIL: BBR test. Error address =
address.
FAIL: BBR test, only 16k bytes
found.
INFO: Self tests complete.
INFO: Downloading switch
software.
ERROR: Code load retried.
FAIL: Code load failed.
Force EPROM download?
INFO: Initial download
succeeded.
INFO: Downloading
compressed release. This may
take up to 1 minute...
INFO: Loading software into
memory. This may take up to 1
minute...
INFO: Executing configuration
script script-name
INFO: Switch startup complete. The startup process is complete and the switch is now

Test Facility

The test facility is a hardware test tool in the switch software. Its primary
function is to validate that there are no hardware problems after installation of
the switch or expansion options. You can also use it as a troubleshooting tool,
but it is just one of many such tools. You could consider the test facility to be a
specialised interface module, such as PPP or Frame Relay, where the interfaces
under test are dedicated to the test facility.
Before you use the test facility, disable configurations by using the
set configuration=none command, and restart or reboot the switch. For more
information about the test facility, see the Test Facility chapter in the Software
Reference.
Description
The BBR size/location test failed at the given location. The
test at this location failed, indicating the end of memory,
but a valid location was discovered in the 255 long words
following this location. The BBR system must be replaced.
Contact your authorised Allied Telesis distributor or
reseller.
The BBR size/location test completed, but only the
displayed amount of memory was found. This amount is
less than the minimum required to run the switch
software.
The startup tests have finished.
The process of downloading the switch software and
vector table from ROM is about to begin.
Loading code from ROM to RAM failed. The load is retried
a number of times, and the error message is displayed
each time it fails. The FAIL message is displayed if the
switch reaches the maximum number of attempts.
Prompt that lets you override the standard startup
sequence, typically when troubleshooting.
Startup tests and download are complete, and the switch
software is about to be started. The release is now
decompressed. This may take a few seconds.
The main switch software is decompressed before being
loaded into RAM.
Configuration commands in the given script are being
executed. If the script has an error, appropriate error
messages are displayed.
performing switching operations.
AT-9800 Series Switch
C613-03059-00 REV F

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-rps9000At-9816gb v2At-pwr9000

Table of Contents