Install The Internal Battery Packs - Liebert GXT2-10000RT208 User Manual

10kva, 60 hz, 120/208/240v
Hide thumbs Also See for GXT2-10000RT208:
Table of Contents

Advertisement

6.4

Install the Internal Battery Packs

To facilitate shipping and installation, the GXT2-10000RT208 ships without the internal battery
packs installed. Once the UPS is installed in place, the internal battery packs must be installed.
Battery
Compartment
1. Unpack the two internal battery packs from their shipping container.
2. Lift one battery pack from its packaging, holding it in the center of the pack.
3. Align the battery pack so that the cable is at the top right closest to the power module in the
frame.
4. Slip the back of battery pack into the battery compartment and slide it in until the battery
reaches the back of the UPS.
5. Install the battery bracket on the front of the battery pack with two screws.
6. Connect the two slotted connectors and tuck the wires in around the battery pack handles.
7. Repeat for the second battery pack.
8. Install the battery cover grille, tightening the three screws.
9. For tower installation, place the vertical overlay over the controls and indicators (see Figure 9).
10. Install the two front bezels.
L ie b e r t
UPStation GXT
Battery connector
Front of Battery
Controls and
Indicators
(horizontal overlay)
Battery cover
17
Installation and Configuration
UPStation GXT
Battery
Battery bracket
Front bezel

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents