Finishing; Door Removal; Glass Removal - Napoleon Torch GT8P Installation And Operation Instructions Manual

Table of Contents

Advertisement

Minimum clearance to combustible construction from fi replace and vent surfaces:
Fireplace framing: - 6" to top
- 0" to stand-offs
(rear and sides)
Vent pipe:
- 1"
Recessed depth:
- 7"
Before the glass door can be removed, the optional frame/
front must be removed.
The glass door is secured to the top front edge of the fi rebox.
Pull the handles of the latches forward, then lift the hooks out
from the slots in the door frame to release the top of the door.
Then, pivot forward until the top edge of the door clears the
front of the fi replace. Next gripping the sides of the door lift
the door out from the retainer along the bottom of the door.
Having removed the door, lay on a smooth fl at surface, face
down. There are 4 glass retainers that need to be bent away
from the glass to release it from the frame. Do not pry on
the glass.
When replacing DO NOT SUBSTITUTE MATERIAL, replace
the gasket (W562-0008) and the glass (W300-0088). Set
new glass into the frame and gently bend tabs into the
gasket to secure.
NOTE: Care must be taken when removing and disposing
of any broken glass or damaged components. Be sure to
vacuum up any broken glass from inside the fi replace before
operation.
CLEARANCES TO COMBUSTIBLES
COMBUSTIBLE
12"
MIN. TO
COMBUSTIBLES
(to ceiling or mantle)
* Any protruding finishing
material installed in this
space (ie. baseboards)
must leave 2" of
unobstructed clearance to
allow for full rotation of the
control door.
2" MIN.*
WITHOUT
FRAME INSTALLED

FINISHING

DOOR REMOVAL

GLASS REMOVAL

FIGURE 25
NON-COMBUSTIBLE
BRICK
6"
MIN.
FRAME
1"
0" IF
NON-COMBUSTIBLE
FINISHING IS USED
SUCH AS BRICK AN
STONE.
1"
1
/
" MIN.
1
2
CONTROL DOOR
(OPEN POSITION)
FIGURE 23
WITH
CLOSED
FIGURE 24
GLASS
GLASS
RETAINERS
15
FRAME INSTALLED
OPEN
GASKET
W415-0619 / B / 03.03.08

Advertisement

Table of Contents
loading

This manual is also suitable for:

Torch gt8n

Table of Contents