Redundant Hot-Plug Power Supply Option (With Cage) - HP ProLiant DL120 G7 User Manual

Hide thumbs Also See for ProLiant DL120 G7:
Table of Contents

Advertisement

Install the battery pack.
8.
Route the cable
9.
Install the PCIe riser cage (on page 19).
10.
Install the access panel (on page 18).
11.
Install the server into the rack
12.
Power up the server (on page 17).
13.

Redundant hot-plug power supply option (with cage)

To install the component:
Power down the server (on page 17).
1.
Remove all power:
2.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Remove the server from the rack (on page 17).
3.
Remove the access panel (on page 18).
4.
Remove the air baffle (on page 19).
5.
Remove the PCIe riser cage (on page 18).
6.
Disconnect any power cables connected to the front drive cage.
7.
Remove all cables connected to the system board.
8.
Remove the system board.
9.
("BBWC battery
cabling" on page 50).
("Installing the server into the
rack" on page 25).
Hardware options installation 40

Hide quick links:

Advertisement

Table of Contents
loading