Securing An Expansion Board For Shipping - HP ProLiant DL580 User Manual

G7
Hide thumbs Also See for ProLiant DL580:
Table of Contents

Advertisement

Install the expansion board.
5.
Install the shipping screw, if necessary. For more information, see "Securing an expansion board for
6.
shipping (on page 58)."
Close the expansion slot retainer.
7.
Connect any required internal or external cables to the expansion board.
8.
Install the access panel.
9.
Power up the server (on page 25).
10.
Resume normal server operations.
11.

Securing an expansion board for shipping

CAUTION:
all expansion slots have either an expansion slot cover or an expansion board installed.
Power down the server (on page 25).
1.
Extend the server from the rack (on page 25).
2.
Remove the access panel (on page 26).
3.
To prevent improper cooling and thermal damage, do not operate the server unless
Hardware options installation 58

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant dl580 g7

Table of Contents