Installation Procedures; Prepare The Site - NETGEAR EN516 Installation Manual

Ethernet hub
Hide thumbs Also See for EN516:
Table of Contents

Advertisement

Installation Procedures

Prepare the Site

Before you begin installing your hub, prepare the installation site. Make sure your operating
environment meets the operating environment requirements of the equipment.
Characteristic
Requirement
Temperature
Ambient temperature between 0 and 40 C (32 and 104 F).
No nearby heat sources such as direct sunlight, warm air exhausts, or
heaters.
Operating humidity
Maximum relative humidity of 90%, noncondensing.
Ventilation
Minimum 2 inches (5.08 cm) on all sides for cooling.
Adequate airflow in room or wiring closet.
Operating conditions
At least 6 feet (1.83 m) to nearest source of electromagnetic noise (such
as photocopy machine or arc welder).
Service access
Minimum 12 inches (19.68 cm) front and back for service access and
maintenance.
Front and back clearance for cables and wiring hardware such as
punchdown blocks.
Power
Adequate power source within 6 feet (1.83 m).
Tabletop requirements Flat area approximately 13 inches (33.0 cm) by 8 inches (20.3 cm).
Rack requirements
Standard 19-inch (48.26 cm) EIA equipment rack, with supplied mounting
bracket hardware; 1.0 EIA rack-mount spaces needed for each
NETGEAR hub.
Wiring hardware
Wiring hardware, such as punchdown blocks or patch panels, should be
complete before installing the hub.
Model EN516/EN524 Ethernet Hub Installation Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

En524

Table of Contents