Installation Procedures; Prepare The Site - NETGEAR EN104 Installation Manual

Ethernet hub
Hide thumbs Also See for EN104:
Table of Contents

Advertisement

The rear panel also includes a DC power receptacle.
The rear panel also includes a DC power receptacle.
Rear Panel of the Model EN104 hub
Rear Panel of the Model EN104 hub
AUI port LEDs
AUI port LEDs
Active
Active
Rx
Rx
Rear Panel of the Model EN108 hub
Rear Panel of the Model EN108 hub
Rear Panel of the Model EN116 hub
Rear Panel of the Model EN116 hub

Installation Procedures

Installation Procedures

Prepare the Site

Prepare the Site
Before you begin installing your hub, prepare the installation site. Make sure your operating
Before you begin installing your hub, prepare the installation site. Make sure your operating
environment meets the operating environment requirements of the equipment.
environment meets the operating environment requirements of the equipment.
Characteristic
Characteristic
Temperature
Temperature
Operating humidity
Operating humidity
Ventilation
Ventilation
Operating conditions
Operating conditions
Service access
Service access
Power
Power
Wiring hardware
Wiring hardware
Model EN104/EN108/EN116 Ethernet Hub Installation Guide
BNC port LEDs
BNC port LEDs
BNC port
BNC port
Active
Active
12Vdc 1.2A
12Vdc 1.2A
BNC
BNC
Rx
Rx
+
+
Power receptacle
Power receptacle
AUI port
AUI port
12Vdc 1.2A
12Vdc 1.2A
BNC
BNC
AUI
AUI
Active
Active
Rx
Rx
+
+
BNC
BNC
12Vdc 1.2A
12Vdc 1.2A
AUI
AUI
Active
Active
Active
Active
Rx
Rx
Rx
Rx
+
+
Requirement
Requirement
Ambient temperature between 0 and 40 C (32 and 104 F).
Ambient temperature between 0 and 40 C (32 and 104 F).
No nearby heat sources such as direct sunlight, warm air exhausts,
No nearby heat sources such as direct sunlight, warm air exhausts,
or heaters.
or heaters.
Maximum relative humidity of 90%, noncondensing.
Maximum relative humidity of 90%, noncondensing.
Minimum 2 inches (5.08 cm) on all sides for cooling.
Minimum 2 inches (5.08 cm) on all sides for cooling.
Adequate airflow in room or wiring closet.
Adequate airflow in room or wiring closet.
At least 6 feet (1.83 m) to nearest source of electromagnetic noise
At least 6 feet (1.83 m) to nearest source of electromagnetic noise
(such as photocopy machine or arc welder).
(such as photocopy machine or arc welder).
Minimum 12 inches (19.68 cm) front and back for service access
Minimum 12 inches (19.68 cm) front and back for service access
and maintenance. Front and back clearance for cables and wiring
and maintenance. Front and back clearance for cables and wiring
hardware such as punchdown blocks.
hardware such as punchdown blocks.
Adequate power source within 6 feet (1.83 m).
Adequate power source within 6 feet (1.83 m).
Wiring hardware, such as punchdown blocks or patch panels,
Wiring hardware, such as punchdown blocks or patch panels,
should be complete before installing the hub.
should be complete before installing the hub.
8738FA
8738FA

Advertisement

Table of Contents
loading

This manual is also suitable for:

En108En116

Table of Contents