Before you begin installing the hub, prepare the installation site. Make sure your operating
environment meets the operating environment requirements of the equipment.
Characteristic
Requirement
Temperature
Ambient temperature between 0 and 40 C (32 and 104 F). No
nearby heat sources such as direct sunlight, warm air exhausts, or
heaters.
Operating humidity
90% maximum relative humidity, noncondensing.
Ventilation
Minimum 2 inches (5.08 cm) on all sides for cooling. Adequate airflow
in room or wiring closet.
Operating conditions
At least 6 feet (1.83 m) to nearest source of electromagnetic noise
(such as photocopy machine or arc welder).
Service access
Minimum 12 inches (19.68 cm) front and back for service access and
maintenance. Front and back clearance for cables and wiring hardware
such as punchdown blocks.
Power
Adequate power source within 6 feet (1.83 m).
Wiring hardware
Wiring hardware, such as punchdown blocks or patch panels, should
be complete before installing the hub.

Install the Hub

Place the Model FE116 hub on a flat surface or mount it on a wall with the hardware included in
the wall mount kit. Be sure the hub is positioned with at least 2 inches of space on all sides for
ventilation.