Schedule Power On/Off - Thecus N0503 User Manual

Ip storage server
Hide thumbs Also See for N0503:
Table of Contents

Advertisement

See the following table for a detailed description of each item.
UPS Setting
Item
UPS Monitoring
Manufacturer
Model
Battery Status
Power
Seconds between power failure and
first notification
Seconds between subsequent power
failure notifications
Shutdown the system when the
battery charge is less than
Apply

Schedule Power On/Off

Using the Thecus IP storage System Management, you can save energy and money
by scheduling the Thecus IP storage to turn itself on and off during certain times of
the day.
From the menu, choose the Schedule Power On/Off item and the Schedule
Power On/Off screen appears.
To designate a schedule for the Thecus IP storage to turn on and off, first enable the
feature by checking the Enable Schedule Power On/Off checkbox.
Then, simply choose an on and off time for each day of the week that you would like
to designate a schedule by using the various dropdowns.
Finally, click Apply to save your changes.
Description
Enable or disable UPS monitoring.
Choose the UPS manufacturer from the dropdowns.
Choose the UPS model number from the
dropdowns.
Current status of the UPS battery
Current status of the power being supplied to the
UPS
Delay between power failure and first notification in
seconds.
Delay between subsequent notifications in seconds.
Amount of UPS battery remaining before system
should auto-shutdown.
Press Apply to save your changes.
47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents