Trane HUV Installation Operation & Maintenance page 20

Classroom unit ventilators
Table of Contents

Advertisement

Factory Installed Piping Packages
Trane has the ability to factory mount piping packages to hydronic coil
selections when ordering TUC, Tracer ZN520, pneumatic, or end-device
controls. (Note: Valves for steam coils are not factory piped.)
Piping packages are available in either 2-way, or 3-way configurations.
The 3-point floating valve is piped on the return side of the coil. Piping
packages are factory leak tested to 90 psig to ensure joint integrity.
(Note: Insulation for the piping packages is field provided and field in-
stalled.)
See Figure 21 for typical piping package.
Piping Package Types
CBV = Circuit balancing valve (page 21)
2 0
Piping
Factory Installed Piping
Figure 21: Typical piping package
(package D shown)
P/T Port = Pressure/temperature port
BV = Bypass balancing valve
UV-PRC001-EN

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vuv

Table of Contents