Gas Safe Register
in the same way as a standard boiler.
A Building Regulations certificate will then be issued
to the homeowner in the normal way.
Distribution Network Operator (DNO)
The Baxi Ecogen installation must comply
in parallel with public low voltage distribution
The Baxi Ecogen incorporates the necessary
grid connection hardware for compliance with
visit www.energynetworks.org
Notifications
Get Fit with Baxi Ecogen™
To help you assist your customer in claiming the FiT
and some useful tools to help you prepare the
paperwork required.
Electricity supplier
The consumer must notify their electricity supplier
product has been connected to the grid to claim the
feed in tariff.