Preinstallation; Accessibility Clearances; Clearances From Combustible Construction - PEERLESS WV-DV Installation, Operation & Maintenance Manual

Series wv-dv oil boilers
Table of Contents

Advertisement

1. PREINSTALLATION

Read carefully, study these instructions before beginning work. It will save time. Study the included drawings. Save these
instructions for reference.
This boiler must be installed by a qualified contractor.
The boiler warranty can be voided if the boiler is not installed, maintained and serviced correctly.
The equipment shall be installed in accordance with those installation regulations in force in the local area
where the installation is to be made, including the current edition of NFPA-31. These shall be carefully followed
in all cases. Authorities having jurisdiction shall be consulted before installations are made.
CAUTION
NEVER BURN GARBAGE OR PAPER IN THE UNIT,
AND NEVER LEAVE COMBUSTIBLE MATERIAL
AROUND IT.
CAUTION
Do not tamper with boiler or controls.
A. ACCESSIBILITY CLEARANCES
To provide for reasonable conditions of accessibility, the
following minimum clearances are recommended:
Alcove Installation.
1. 12" from left side
2. 24" from top
3. 24" from front
4. 9" from right side and rear
B. CLEARANCES FROM COMBUSTIBLE
CONSTRUCTION
The design of this boiler is certified for the following

clearances from combustible construction:

1. 0" from rear
2. 0" from right and left sides
3. 0" from top
4. 0" from vent pipe
5. 0" from vent connector
6. 0" from vent terminal
7. 24" from front
NOTICE
Do not use this appliance if any part has been under
water. Improper or dangerous operation may result.
Immediately call a qualified service technician to
inspect the boiler and to replace any part of the
control system and any control which has been
under water.
PREINSTALLATION
WARNING
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents