Oil Burner; Burner Installation - PEERLESS WV-DV Installation, Operation & Maintenance Manual

Series wv-dv oil boilers
Table of Contents

Advertisement

5. OIL BURNER

CAUTION
BURN ONLY #2 FUEL OIL IN THIS APPLIANCE. DO
NOT USE GASOLINE, CRANKCASE DRAININGS OR
ANY OIL CONTAINING GASOLINE.
A. BURNER INSTALLATION
1
The oil burner is supplied with a mounting flange
fixed in position.
2. BE SURE HI TEMP GASKET IS BETWEEN THE
BURNER MOUNTING FLANGE AND THE
COMBUSTION CHAMBER COVER PLATE.
3. Care must be taken when routing the oil lines so not
to interfere with the opening and closing of the
burner mounting plate. Flexible oil lines or flared
copper disconnects with valves (when copper lines
are used) may be installed to assure full opening of
the burner mounting plate when servicing.
Note:
Two-pipe oil supply for Riello burner requires a sep-
arate kit. Order part #C7001026 from Riello dealer.
4. Oil Burner Specifications:
For information pertinent to the oil burner such as
nozzle sizing, fuel supply piping, adjusting or
servicing, refer to the charts below and the burner
installation manual.
5. Sampling tapping in CeraFlex Appliance Adapter must
be used for CO ² , smoke and flue pressure readings.
6. Burner should start automatically when thermostat is
turned up and main boiler service switch is turned
on. If burner does not start, check to be sure there is
oil in the tank and push reset button on burner
control: (Beckett) square red button; (Carlin) round
red button; (Riello) round red button inside clear
flexible cover on back of burner cover. If burner still
does not start, contact serviceman.
CAUTION
Do not attempt to start the burner when excess oil
has accumulated, when the unit is full of vapor, or
when the combustion chamber is very hot.
7. Burner and boiler can be shut down by turning
down the thermostat and moving the main boiler
service switch to the "off" position.
CAUTION
Always keep the manual fuel supply valve shut off
if the burner is shut down for an extended period
of time.
8. Post-purge timing on Riello BF5 burner is controlled
by 3/8" diameter dial near top right corner of
AL1009 circuit board inside burner cover. Post-purge
duration must be a minimum of one minute. Adjust
dial so arrow is pointing directly to the right (toward
mounting screw for AL1009 bracket). Check post-
purge timing to confirm it is at least one minute long.
OIL BURNER
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents