" Oil, Gas or Comb|nhtion Knockdown (Factory Assembled Split Block Sections) or Packaged Water or Steam Boilers 6 Sizes 5-10 Sections Input 83.7% Combustion Efficiency Forced Draft Venting • Only Requires a Three Foot Vent Above the Roof High Efficiency Power Burners •...
Page 3
pr=-r=-RLESS Series SC/SCT Semi-Commercial • Packaged or Knockdown Forced Draft Venting Power Burner CAST IRON BOILERS • Oil, Gas, Gas/Oil J Steam or Hot Water Boilers Optional Tankless Coils Available from the factory as knockdown split blocks or completely packaged assembled units, with steel push nipples, for easy installation.
Page 4
Cast Iron Block Steam Water 3/4" Low Limit Control Cast Iron Section 3/4" Press• Gauge, Oper. Cont. & Limit Cont. 3/4" Operating Control 3/4" Limit Control 1/4" Theraltimeter _/2" Gauge Glass & Low Water Cutoff Return Optional Return Secondary Probe Secondary Probe Low Water Cutoff...
Page 5
I ",11 ".J I _(e]lV]f_e]_F_l WATER PIPING The supply and return connections should STEAM PIPING sized to suit the system. The supply should piped out of the top of the back section and the The return from the system should always enter return piped to the bottom...
Page 6
SERIES SC/SCT BOILER SPECS _.'tl:llll41lUJl'.lll=!lli 17|=l[tllltl |[!l[o[_olol Boiler *Approx. Model Shipping Wt. • Factory Assembled Split Block Number (Ibe.) (5 & 6 Section t Block) (W, WU, S, SU Models) • Hi-Temperature Rope Seal SC-05 • Deluxe Insulated Enameled Steel Jacket SCT-05 •...
SERIES EC/ECT/SC/SCT INSTALLATION, OPERATION & MAINTENANCE MANUAL ADDENDUM FOR INSTALLATION OF PRIMARY PROBE LOW WATER CUT OFF LIMIT x 3 NIPPLE TAPPINGS A & x 3/4 x 1/4 APPUCATION STEAM GAUGE 1 1/2 NPT/ w/ 5/4 x 1/4 SKIM TAPPING_ BUSHINO 1/4"...
Page 8
Cleaning the Series EC/SC Steam Boiler with Skim Tapping The following cleaning procedure shall be performed by a qualified service person. Refer to Figure 1 for location of skim tapping. 1. Clean the boiler as described below no later than one week after the initial start up. Cleaning will be more effective if the boiler operates a day or two to loosen sediment and impurities in the system, 2.
Page 9
INSTALLATION INSTRUCTIONS - SERIESSC and SCT Readcarefullybeforebeginning work.It willsavetime.Studythe included d rawings. Theequipmentshallbe installed in accordance with those installation regulationsin force in the localareawherethe installationis to be made.Theseshall be carefullyfollowedin al!cases.Authoritieshavingjurisdictionshallbe consultedbeforeinstallations are made, A - ACCESSIBILITY CLEARANCES 1-- To providefor reasonableconditionsof accessibility for servicing, t he followingminimumclearancesare recommended betweenthe boilerand adjacentwalls or otherappliances--24"on the rightside, 36"on the left side,and 30"...
Page 10
FRONT SPLIT REAR SPLIT LARGE BLOCK ASSEMBLY BLOCK ASSEMBLY PUSH NIPPLE TEMP )RAW-UP WASHER DRAW-UP WASHER ROPE X -100t 3/4" DRAW DRAW-UP WASHER LUGS X - 1009 - UP WASHER X - 1009 I/2" DRAW SMALL PUSH NIPPLE _ FIGUREI SIDE CLEAN-0UT COVER PLATE W/INSULATION...
Page 11
D - JACKETASSEMBLY 1-- Referto Page4 for explodedview.Attach the backjacketpanel(19) to bosseson middleof backsectionwith two 1.4" x %"truss headmachinescrews(20) provided. T he backpanelhas two%0"dia. holescloseto the centerof the panel. 2-- Locateceramicblanketlinerand install in combustion chamberfloor,placingback edgeof blanketagainstbottomedge oftargetwall. 3-- Placethefront jacketpanel(23) on the blockand attachthecombustion chambercoverplateassembly(3). 4-- Attachthe rightsidejacket panel(22)to thefront and backpanelswith sheet metalscrews.
Page 14
SERIESSC/SCT ModelNo. SCPaCT..08 SOSOT..09 Item No. Part No. SCiSCT-05 SC/SCT-06 SCiSCT-07 SC/SCT-10 Description 1/4"-20x 3/8" TrussHd. Mach.Screws- Cad. Plate- 2 Req'd SC-6001-5 Left SideJacket Panel SC-6001 Left Side JacketPanel LeftSide JacketPanel SC-6001-1 LeftSide JacketPanel SC-6001-2 LeftSide JacketPanel SC-6001-3 Left SideJacketPanel SC-6001-4 SC-6002-5 RightSide JacketPanel...
Page 15
E - PIPING DONOT PIPEBOILERUNTILAFTER JACKETIS INSTALLED. 1-- See Figures5 and 6 for suggestedpipingto the boiler. 2-- Makeup coldwater supply connectionto the boiler. 3-- Installpressure gaugeor theraltimeter in tappingprovided.See Figure7. 4-- Plugall opentappingsin the boilerand fill withwater.Pressurize boilerto 45 PSIGfor 30 PSIGsectionsand 75 PSIGfor 50 PSIG sections.Checkto makecertainthat all joints andfittingsare watertight.
Page 16
- OIL BURNERINSTALLATION 1-- Theoilburneris suppliedwitha mounting f langefixedin position. 2-- Mountthe burnerto the combustion chambercover plate(3) with four5/16"-18x 1"studsand nutsprovided. BE SUREHI TEMP GASKETIS BETWEEN THE BURNERMOUNTING FLANGEAND THECOMBUSTION CHAMBER COVERPLATE. 3-- Oil BurnerSpecifications. BECKE'n'BURNER CARLINBURNER Boiler Burner *Nozzle Pressure Boiler Burner...
Page 17
FRONT FIGURE7 DIMENSIONS Distance Dist.Betw. Length Rearof BoilerBurner Number Jacket Jacket Fire Jacketto c/I Flue Between FrontTap. Unit Number Width Length Floor of Flue Size Tappings & Tap.Inter. WU or SU Sections "A ..B..C..D..E" "F ..G..
Page 19
• . UNION I'CROSS NIPPLE "x IO" NIPPLE JACKET PANEL ,PECIAL TAPPED INTERMEDIATE SECTION Illl INSTALL I'BLOW-OFF VALVE I*x ,4" N _PI::'L E UNION FLOOR NOTES:CONNECTING FITTINGS SHOWN THIS DRAWING TO BE SUPPLIED BY INSTALLER ON COMB FEEDER CUT-OFF MODELS BURNER CUT-OFF LEVEL...
Page 20
IPPLE LEVEL MARA CASTING INSTALL I_IBLOW-OF'F VALVE I"X 3" NIPPLE I"G. J. UNION I"X 4" NIPPLE NOTE: CONN_CTING FITTINGS SHOWN DRAWING THIS T_ E)_ SUPPLIED BY INSTALLER FIGURE10...
Page 21
McD& M #67PE-2 LOWWATERCUT-OFF -CUT LEVEL PIPE CONNECTION FIGURE11 I - WIRING 1-- Allalectricalwiring shallbe doneinaccordance w ith theNational E lectrical Cedeand LocalRequirements. 2-- Forrecommended wiring, S ee Figures 12 and 13. 3-- Forcomplete information on servicing a ndadjustment ofcontrols, refertotheattachedcontrol specification sheets. NOTE:Single PoleSwitchesincluding t hoseofSafetyControls or Protective D evices shallnotbewiredin a grounded line.
Page 23
K - SERIES SC AND SCT RATINGS VenP Net I-B-R Ratings I-B-R Burner Capacity 4 Gross UnitNumber I=B=R Boiler Burner Size Height F eet Water _ Steam3 Steam G.P.H. M,B.H. Boiler Output M.B.H, M.B.H, Inches (Min.) WUor SU Sq.R. Input _ Input M.B.H.
Page 24
Series SC/SCT Oil, Gas 8 Gas/Oil Boilers Installation, Operation Maintenance Manual TO THE INSTALLER: This manual is the property of the owner and must be affixed near the boiler for future reference. TO THE OWNER: This boiler should inspected annually Qualified Service Agency,...