Ce Certificate - Fujitsu D2109 Technical Manual

System board and sas controller for tx200 s3
Table of Contents

Advertisement

CE Certificate

Notes about boards
During installation/deinstallation of the system board, observe the specific
instructions described in the service manual for the server.
Remove the plug from the mains outlet so that system and system board are
totally disconnected from the mains voltage.
To prevent damage to the system board, the components and conductors on
it, please take great care when you insert or remove boards. Take great care
to ensure that extension boards are slotted in straight, without damaging
components or conductors on the system board, or any other components,
for example EMI spring contacts
Be careful with the locking mechanisms (catches, centring pins etc.) when
you replace the system board or components on it, for example memory
modules or processors.
Never use sharp objects (screwdrivers) for leverage.
2.2
CE Certificate
The shipped version of this board complies with the requirements
of the EEC directive 89/336/EEC "Electromagnetic compatibility".
Compliance was tested in a typical PRIMERGY configuration.
10
Technical Manual
Important notes
D2109 (TX200 S3)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D2107

Table of Contents