Section 2. Installation; Introduction; Unpacking - Henny Penny ROTISSERIE SCR-6/8 Operator's Manual

Henny penny corp. convection oven user manual
Table of Contents

Advertisement

2-1. INTRODUCTION

2-2. UNPACKING

303

SECTION 2. INSTALLATION

This section provides the installation instructions for the Henny
Penny Rotisserie.
Installation of this unit should be performed by a qualified
service technician. The installation of this unit must conform to
all local, state, and federal codes.
Do not puncture the rotisserie with any objects such as
drills or screws as electrical shock, or component
damage could result.
The Henny Penny Rotisserie has been tested, inspected, and
expertly packed to ensure arrival at its destination in the best
possible condition. The unit is packed inside a heavy
cardboard carton with sufficient padding to withstand normal
shipping treatment.
Any shipping damages should be noted in the presence of the
delivery agent and signed prior to his or her departure.
To remove the Henny Penny Rotisserie from the carton you
should:
1.
Carefully cut banding straps.
2.
Remove packing from around the unit.
3.
Lift carton from unit.
4.
Remove brackets securing unit to skid.
5.
Remove unit from skid.
6.
Your rotisserie is now ready for setup.
SCR-6/8
2-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rotisserie scr-6Rotisserie scr-8

Table of Contents