Electrical Requirements - Bunn TITAN DUAL Installation & Operating Manual

Table of Contents

Advertisement

ELECTRICAL REQUIREMENTS

WARNING - If the power cord is ever damaged, it must be replaced by the manufacturer or its service agent with
a special cord available from the manufacturer or its service agent in order to avoid a hazard.
Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.
WHI
N
BLU
L3
RED
L2
BLK
L1
GREEN
120/208 and 120/240 volt ac
three phase, 50/60 Hz models
Note: This electrical service consists of 4 cur-
rent carrying conductors (Neutral, L1, L2 and
L3) and a separate conductor for earth ground.
SYSTEM
VOLTAGE
208
240
L1, L2, L3, are the 3 phases
V1 = Phase to phase voltage, between any 2 phases.
V2 = Phase to neutral voltage, L1 to neutral must be 120V.
ELECTRICAL HOOK-UP
CAUTION – Improper electrical installation will damage electronic components. Damage caused by incorrect
electrical connections is not covered by warranty.
1.
An electrician must provide electrical service as specified in conformance with all local, state and federal
electrical codes.
2.
Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
NOTE - The brewer is shipped without a plug on the power cord. Qualified service personnel must select
and install the proper UL listed grounding type attachment plug specified on the rear of the brewer.
3.
Install the specified plug on the attached power cord.
4.
Remove the front access panel to gain access to the terminal block.
5.
Connect the brewer to the power source and verify the voltage at the terminal block before proceeding.
6.
If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing
has been hooked up, the brewer is ready for Initial Set-Up.
FOR SINGLE PHASE OPERATION
MOVE BLU WIRE INTO TERMINAL
BLOCK WITH BLACK WIRE.
GREEN
CONNECT INPUT WIRING TO:
L1, L2 & N FOR 120/208V &
120/240V MODELS,
L1 & N for 230V MODELS.
V1
V2
208
120
240
120
TO MACHINE
L1
L2
L3
N
FROM POWER SOURCE
400/230V volt ac three phase,
Note: This electrical service consists of 4 cur-
rent carrying conductors (Neutral, L1, L2 and
L3) and a separate conductor for earth ground.
SYSTEM
VOLTAGE
L1, L2, L3, are the 3 phases
V1 = Phase to phase voltage, between any 2 phases.
V2 = Phase to neutral voltage, L1 to neutral must be 230V.
Page 4
WHI
N
BLU
L3
RED
L2
BLK
L1
GREEN
50/60 Hz models
V1
V2
400
400
230
230
230
GREEN
40119 080108

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents