Brick Installation - Quadra-Fire HUDBAY-INS Owner's Manual

Hudson bay insert direct vent gas appliance
Hide thumbs Also See for HUDBAY-INS:
Table of Contents

Advertisement

F. Brick Installation
The pilot shield has to be removed to install or remove the
brick refractory. Removal of the bracket requires remov-
ing two screws.
PILOT
BRACKET
Figure 8.9
To install the baffl e, slide it in at an angle and rotate
upward, parallel with the fi rebox. Place baffl e up against
the heat exchangers in top of the fi rebox. Holding the baffl e
against the heat exchangers, slide the baffl e towards the
front of the appliance.
Note: To aid in brick installation, the burner may be removed.
Figure 8.10
Keeping the baffl e elevated with your free hand, put the
right side brick into position. Rest the baffl e on the right
side brick.
Figure 8.11
18
PILOT
SHIELD
Quadra-Fire • Hudson Bay Insert • 7008-115 Rev. H • 10/08
Still holding the baffl e in place, install the left brick into
position.
Figure 8.12
Bend retaining tabs on the left and right sides inward to
hold brick in place.
RETAINING TABS
RETAINING TABS
Figure 8.13
Install the rear brick. Slide it in at an angle and place it over
the rear brick retainer. Hand bend retaining tabs up to hold
brick in place. Slide baffl e back until touching rear brick.
Figure 8.14

Advertisement

Table of Contents
loading

Table of Contents